BidScoper
Available Now

Asphalt Estimating

Road overlays, parking lots, removal — with HL-3, HL-4, and granular calculations.

For Asphalt & Paving Contractors

Road overlays, parking lots, removal — with HL-3, HL-4, and granular calculations.

Asphalt HL-3/HL-4 on Granular A/B

Four-layer template: HL-3 (40mm), HL-4 (50mm), Granular A (150mm), Granular B (300mm). Density default 2.4 t/m³. Auto-computes volumes and tonnages for each layer.

Asphalt Removal by Area

50mm default removal depth. Density-based tonnage calculation for disposal estimating. Override depth and density per measurement for varying site conditions.

Waste Factors

Waste factor applies to all volume computations. Set once in the template or override per measurement. Typical range: 3–10% depending on conditions.

Multiple Scales per Page

Road projects often have an overview sheet at 1:500 and detail cross-sections at 1:50. Calibrate each viewport independently — measurements stay accurate across scales.

Stop Losing Bids to Manual Takeoffs

Start your free trial today. No credit card. No installation. No desktop software.

Start Free Trial